KGHM, PLKGHM000017

KGHM stock trades unchanged at EUR 79.21 in weekend trading

Published on 10/10/2026 at 11:16 | Editorial responsibility: Rafael Müller, Editor-in-Chief AD HOC NEWS

KGHM stock costs EUR 79.21 in weekend trading on October 10, 2026 after a Xetra close of EUR 79.21. EU status supports two projects.

Key points in brief

  • KGHM traded at EUR 79.21 in weekend trading on October 10, 2026.
  • The reference close at Lang & Schwarz was EUR 79.21.
  • The European Commission granted strategic status to two KGHM projects.
KGHM, PLKGHM000017, Illustration mit AI erstellt.
KGHM, PLKGHM000017, Illustration mit AI erstellt.

KGHM traded at EUR 79.21 in weekend trading at Lang & Schwarz at 11:13 a.m. CEST on October 10, 2026, unchanged from the EUR 79.21 close at Lang & Schwarz on October 9, 2026.

The week in figures

The October 10 weekend indication was EUR 79.21, with a reference close of EUR 79.21 and a change of 0.00 percent. The documented price range in the reviewed period extended from EUR 74.39 to EUR 79.21.

The further course of weekend trading at Lang & Schwarz until 1:00 p.m. CEST is shown by the continuously updated real-time quote of KGHM stock.

Chronology of the week

On October 7, KGHM’s stock was reported at EUR 77.66. On October 8, the reported price was EUR 74.39. On October 9, the stock was reported at EUR 78.75.

Company development

On October 9, the European Commission granted strategic-project status to two KGHM investments: development of the Retków-Grodziszcze deposit and the transformation of the Legnica copper smelter into an integrated recycling facility, according to an issuer-authored KGHM release distributed by Strefa Inwestorów.

The two investments have a combined value of more than PLN 9.5 billion. KGHM said the Retków-Grodziszcze project is intended to enable extraction of more than 100 million tonnes of polymetallic ore containing nearly 1.5 million tonnes of copper and more than 5,000 tonnes of silver by 2055. The Legnica project is designed for annual output of about 135,000 tonnes of electrolytic copper and 250 tonnes of nickel.

Dates of the coming week

The next Xetra session is scheduled for October 12, 2026. KGHM’s investor calendar, as reported on the company topic page, lists the next report for November 18, 2026.

Market context: Market report WIG 20.

Disclaimer...

en | PLKGHM000017 | KGHM | boerse | 70288123 | bgmi